Continental

Continental

PILOT BULLETIN

Date:           
September 3 , 2002
File #:          
I-02-180

Subject:       
Bid 03-08
System Bid

TO: 
All Pilots                       � 03-08
SYSTEM BID
������   
                  

The current 2003 business plan projections require us to
modify the staffing levels of the 03-01 System Bid. Contributing factors in
the sizing of the 03-08 System Bid include an increase in the IAH 777
staffing to cover the IAH-AMS route beginning in May 2003 as well as the
previously announced reductions of MD80 aircraft. Additionally, the 737 First
Officer surplus will be more evenly distributed between domestic bases.
Although this bid shows an overall number of reductions, these will be met
through planned retirements and other attrition.  Additionally, there
are sufficient Captain positions included on this bid to permit a pilot who
held Captain on the 03-01 Adjustment Bid to continue to hold a Captain
position.  The results of this bid will be utilized in awarding
vacation for 2003.
 

All provisions of the ratified
change to Section 9.3 of the CBA, as found in LOA #12, are in effect. 
 

The
following sub-base changes are included with this bid: 

None

   
None

The
following primary vacancies/reductions are included with this bid :               

VACANCIES

REDUCTIONS

IAH
777 CA/FO

IAH
M80 CA/FO

GUM
737 CA

CLE
737 FO

 

IAH
756 FO

 

 

Bid 03-08 Schedule:

1.

Bid 03-08 is posted for bidding
effective September 3, 2002.

2.

Bid 03-08
will close Tuesday, September 24, 2002 at 1000 CDT.

3.

Bid 03-08 will be effective August
01, 2003.

Before bidding, you are strongly encouraged to review
all the “Bidding Notes” as well as the Pilot Contract Section 9,
System Staffing, Section 14, Training, Section 16, Moving Expenses, Letter of
Agreement #12 � Modifications to Section 9.3, and Letter of Agreement #2,
Guam Flying.

 

 

 

Bidding Notes:    

1.      
The starting position for System Bid 03-08 will be the System Bid
03-01 Adjustment Bid awarded or adjusted position whether or not the pilot
has been trained or advanced to this position.  This awarded position
may have been adjusted by subsequent base trades and by training
failures/withdrawals. 

2.      
Once this bid is awarded, a training and advancement plan will be
developed.  Training classes resulting from this bid award may begin as
early as early October 2002.  Pilots will be assigned to training in
accordance with the CBA, Section 14, Part 3.A. 

3.      
The following is a brief synopsis of the anticipated missions by fleet
type: 

          
EWR/IAH 777

�        
Long Haul Flying � Atlantic and Pacific
Routes.                                               

          
EWR 737

�        
Type of flying � domestic, Caribbean, Mexico, Canada, Central America,
and some IRO trips.

�        
Trip mix � very good (a good balance of 1, 2, 3, and 4 day trips)

�        
Commutability – very poor � (early morning departures and late
arrivals)

          
CLE 737

�        
Type of flying � domestic, Canada, some Caribbean and Mexico.

�        
Trip mix � mostly 4 day trips, some 1,2,3 day trips.

�        
Commutability – fair

IAH 737

�        
Type of flying � domestic, Canada, Caribbean, Mexico, Central America,
some South America and some IRO trips.  The largest, most diverse
737base.

�        
Trip mix � good

�        
Commutability � good (a good balance of commutable trips) 

          
EWR 757/767

�        
Type of flying � domestic, trans Atlantic, Central and South America,
Caribbean, and Pacific with numerous IRO trips.

�        
Trip mix � good (domestic 1,2,3 and 4 day trips, international usually
3-day trips, some 5 and 6 day trips).

�        
Commutability � very good

 

IAH 757/767

�        
Type of flying � primarily domestic (limited trans Atlantic), Central,
South America and Pacific, and some IRO trips.

�        
Trip mix � fair  (domestic 1,2,3 and 4 day trips, international
3,4 and 6 day trips).

�        
Commutability � good 

IAH MD80

�      
Types of flying � domestic (more east coast than west) and Mexico destinations.

�      
Trip Mix � fair (few turn lines)

�      
Commutability – good

4.      
This bid does not contain any “New” domiciles or
“New” equipment as defined in the CBA. 

5.      
When long range international flying on the 777, 757/767, or 737 requires
an augmented crew, then that requirement will be filled from the 777,
757/767, or 737 First Officers respectively. All pilots awarded the 777,
757/767, or 737 will continue to be type rated.

6.      
 A training freeze will be incurred by any pilot whose
scheduled training exceeds five classroom days, four simulator periods, or an
aircraft trainer, in accordance with the LOA #12, paragraph G. The training
freeze is a result of the training required by the Continental Airlines
Flight Operations Training Manual.  As an example, Pilot #1 is displaced
from a NYC 777 CA position and is awarded NYC 756 CA.  Pilot #2, a NYC
737 CA, is awarded a vacancy as a NYC 756 CA.  Neither pilot is
previously qualified on the 756, therefore both pilots require training which
will result in a two (2) year training freeze.  To be free of a training
freeze, it must expire prior to the effective date of this System Bid (August
01, 2003). 
Pilots who have actually started training or have an
assigned training date beginning prior to November 1, 2002 will have training
freezes applied for this bid. NOTE: Pilots will
be released from training freezes associated with the 02-06 System Bid award.
In addition 737 first officers will be released from any applicable freeze.
This is expected to be the last  release of freezes due to the 02-06
award.
 
As an example, if a pilot held 737-CA on both
02-07 and 02-06 and was trained as a 737- CA in Nov 2001, then he would be
subject to the training freeze. However, if a pilot held 737-CA on 02-07 and
held 756-FO on 02-06 and was trained as a 756-FO in Nov 2001, he would be
released from the 756-FO freeze for the 03-08 bid.   

7.      
Moving expenses will be paid in accordance with the CBA Section
16, Part 1.A, and Letter of Agreement #2 on Guam Flying.  

8.      
Percentage bidding remains in effect.  Percentages are
considered for purposes of the bid award only.  A pilot’s bid award
percentage may differ from the actual staffing percentage due to changes in
sub-base staffing. 

Percentage bidding for
pilots desiring to enter or remain in a sub-base status is based upon the
posted minimum staffing requirement.  A pilot must bid 100% to be
awarded a position between the posted minimum and maximum requirements of a
sub-base status.  In order for a displaced pilot to be awarded a
position between the posted minimum and maximum requirements
, he must bid 100% and there must also be a more
junior pilot in that sub-base status.
 

Pilots using percentage bidding to become a line
holder should normally bid at least 70 percent due to total reserve staffing
requirements in a sub-base.  However, if surplus pilots exist in the
sub-base, this percentage could be lower. 

9.      
The Standing Bid on File system remains in effect.  If you choose
to modify your current standing bid on file, once you have completed your
entries, you must see “001 TRANSACTION COMPLETE” to assure
your bid has been accepted into the computer system.  Screen prints are
a good practice for your records. 

11.  
Pilots are reminded to review the Co-Terminal Section of the
Contract.  Successful bidders for the NYC and IAH bases should be aware
of the co-terminals as defined in Section 24 of the Pilot Contract. 

12.  
BID WHAT YOU WANT, DON’T BID
WHAT YOU DON’T WANT!
 

13.  
Pilots are reminded to bid
sufficient choices in the event they are displaced from their current
sub-base.
  If you become
displaced, you will be considered eligible (ref. LOA #12, paragraph 3.B).
 
If you are age 58 or older by the effective date of the bid, and become displaced,
the provisions of LOA #12 will govern your system bid award, paragraph
K.3. 

If you are a displaced pilot
who does not bid sufficient choices, you will be assigned your present
sub-base equipment in the next lower status.  If your seniority does not
permit that assignment, you will be assigned based on current qualifications
and Company requirements.  This is in accordance with the CBA, LOA #12
paragraph E.4. 

14.  
This Bid will be published and awarded using minimum and maximum
staffing levels.  The following explanation may be helpful in
understanding its use.  

If the available pilots in a sub-base status
exceed the maximum number of pilots indicated, then displacements occur down
to that maximum number.  Resultant (secondary) vacancies will only occur
in a sub-base status when the number of pilots in that sub-base status is
less than the posted minimum requirement.   

Posted vacancies are created at the beginning of the bid
process when available pilots in that sub-base status are less than the minimum
requirement.  In this case, the minimum and maximum staffing will be
equal.  Pilots wishing to bid into a sub-base status are only allowed to
enter when the total pilots in that sub-base status falls below the minimum
requirement.  Displaced pilots are also allowed to enter the sub-base
status if there is a more junior pilot in the sub-base status. This last
provision assumes the displaced pilot meets any applicable bid sequencing
requirements.

EXAMPLES:      SUBBASE      
MINIMUM        MAXIMUM    
CURRENT

 
                       
IAH 737 CA 
                       
73                       
75                
75

#1. If during the award process three (3)
captains bid out of the IAH 737 CA sub-base, the number of remaining pilots
total 72; therefore one (1) resulting vacancy would be filled to maintain 73.
The bid award program will then go back to the top of the seniority list
looking for pilots bidding IAH 737 CA until the position is filled or the
point where the resultant vacancy was created and then proceed with the
award. 

#2. If during the award process one (1) Captain bids out
of the IAH sub-base, the number of remaining pilots total 74.  In this
case, there would be no vacancy created as the total pilots in the IAH 737 CA
sub-base would be within the acceptable limits (between the posted minimum
and maximum requirements.)  However, if a pilot was

displaced and he was senior to the 74th pilot, he could
displace into the IAH 737 CA sub-base.  

15.  
As a result of the changes to Section 9 of the CBA found in LOA #12,
several additional items should be considered when bidding: 

  A. If you become displaced from your awarded
position, you will be considered an �Eligible� bidder.  This means there
is no requirement to bid previously qualified equipment solely because you
are subject to a freeze. 

B. If you are attempting to use seniority displacement
within your domicile in addition to bidding previously
qualified equipment, you must bid equipment in the same or higher bid
category at 100% before bidding
other equipment.  Bid �Category� is a new term that is defined in LOA
#12 paragraph A. 

    
     Category A – B777

    
     Category B – MD80, B756

    
     Category C � B737 

C. Age 58 pay protection changes require that in order to
receive and retain pay protection for higher
status or higher category, you must bid and otherwise be able to be awarded
or retain the position for which you will be protected.



Pilots turning age 60 between January 1, 2003 and
August 1, 2003

Name

Init

Dom

A/C

Pos

Date Age 60

Name

Init

Dom

A/C

Pos

Date Age 60

MCDONALD

RP

IAH

737

CA

01/02/03

WOODCOCK

CW

IAH

M80

FO

05/12/03

DIXON

WB

IAH

M80

CA

01/03/03

BRAUN

D

NYC

737

CA

05/17/03

SIDKY

H

NYC

756

FO

01/08/03

FRIESZ

RW

NYC

737

CA

05/17/03

FLASCH

JA

IAH

M80

FO

01/08/03

DOURIS

L

IAH

737

CA

05/20/03

QUAINTANCE

MJ

NYC

777

CA

01/16/03

BENNETT

RE

IAH

777

CA

05/23/03

CAMPBELL

WR

GUM

737

CA

01/20/03

UTLEY

JP

IAH

756

FO

05/24/03

SEALS

DP

NYC

737

FO

01/21/03

FUSCO

PJ

IAH

737

CA

05/24/03

MCKENDRY

WE

NYC

777

CA

01/23/03

DANNERTH

RC

NYC

756

FO

05/25/03

OWEN

KD

NYC

777

CA

01/27/03

PECK

RR

IAH

M80

CA

05/26/03

LINDBERG

ME

NYC

756

CA

02/03/03

SMITH

LC

NYC

756

CA

05/29/03

PLUNKETT

LK

IAH

M80

CA

02/05/03

THOMAS

TE

NYC

737

CA

05/29/03

LEE

KS

GUM

737

CA

02/07/03

PIA

DR

IAH

737

FO

05/30/03

MANFREDI

JA

NYC

737

CA

02/08/03

JOYNER

DW

IAH

737

CA

05/31/03

PROTHRO

JB

IAH

777

CA

02/10/03

WAMPLER

ME

IAH

777

CA

05/31/03

O’CONNELL

PD

IAH

M80

CA

02/11/03

UZZLE

JL

NYC

737

CA

06/03/03

FULLER

MB

IAH

777

CA

02/13/03

ELLIS

WD

IAH

777

CA

06/03/03

MURPHY

TL

NYC

737

CA

02/13/03

ASHTON

WL

NYC

777

CA

06/04/03

PLEGGENKUHLE

CM

IAH

777

CA

02/17/03

JOHNSON

RB

NYC

737

FO

06/04/03

POLAND

RC

IAH

737

CA

02/24/03

ASHELFORD

FJ

IAH

M80

FO

06/06/03

GOODWIN

RC

CLE

737

CA

02/26/03

SHEELY

RA

NYC

737

CA

06/08/03

RIECKER

CC

NYC

737

CA

02/28/03

MEDLEY

WM

GUM

737

CA

06/09/03

DEGIORGIO

JR

IAH

777

CA

02/28/03

JACOBS

WM

IAH

737

FO

06/11/03

FILLMAN

DF

IAH

777

FO

03/01/03

O’NEIL

JM

IAH

737

CA

06/13/03

PETERSON

SH

IAH

777

CA

03/02/03

KENNEDY

LJ

CLE

737

CA

06/15/03

LUM

CD

IAH

737

CA

03/06/03

BRUBAKER

DE

NYC

737

FO

06/16/03

Name

Init

Dom

A/C

Pos

Date Age 60

Name

Init

Dom

A/C

Pos

Date Age 60

SHEPPARD

AB

IAH

756

FO

03/08/03

BAUER

RC

IAH

777

CA

06/27/03

MECHEM

LA

NYC

777

CA

03/19/03

VITALI

JP

IAH

M80

FO

07/02/03

GRAVES

WR

IAH

737

CA

03/21/03

GALATI

GA

IAH

756

FO

07/02/03

SEARS

WL

IAH

777

CA

03/21/03

FOLWELL

TS

NYC

777

CA

07/03/03

COLVIN

LH

NYC

737

CA

03/23/03

GRADY

JH

NYC

777

CA

07/06/03

MCDONALD

RE

IAH

756

CA

03/29/03

BOOZELL

RM

NYC

777

CA

07/07/03

LUTKENHOUSE

JP

NYC

756

FO

04/02/03

WOODSON

RA

IAH

756

CA

07/07/03

DECK

RM

NYC

737

CA

04/04/03

HUNT

TF

GUM

737

CA

07/07/03

BIES

GE

NYC

756

FO

04/09/03

MASON

JC

IAH

737

CA

07/09/03

FOGAL

DA

CLE

737

CA

04/12/03

CORAH

FL

IAH

777

CA

07/10/03

MONFORTE

VA

NYC

777

CA

04/15/03

DASKEVICH

J

IAH

737

FO

07/10/03

WELLS

ML

IAH

M80

FO

04/21/03

ROBERTS

LW

IAH

737

FO

07/11/03

GAZDA

RS

NYC

756

FO

04/24/03

HOWER

LD

NYC

756

CA

07/11/03

BOOKER

D

IAH

737

FO

04/26/03

PRESTON

JR

IAH

777

FO

07/12/03

POLLOCK

RE

IAH

737

FO

04/28/03

SPENCE

GB

IAH

777

CA

07/14/03

HARPER

JH

NYC

777

CA

04/28/03

EDWARDS

DL

IAH

737

CA

07/14/03

STRACHAN

JT

NYC

777

FO

05/01/03

RYAN

HD

IAH

M80

FO

07/15/03

GRAY

KL

NYC

777

CA

05/01/03

REDMAYNE

RB

IAH

756

FO

07/16/03

WALLACE

WJ

IAH

756

CA

05/04/03

DOTSON

C

IAH

737

FO

07/17/03

HALL

LR

NYC

777

CA

05/06/03

ELLIS

ST

IAH

737

CA

07/17/03

CARLSON

GB

IAH

777

CA

05/07/03

ROSS

GS

IAH

756

CA

07/18/03

BARNES

RC

NYC

737

FO

05/08/03

SELLMEYER

WF

NYC

777

CA

07/18/03

WHITE

CA

NYC

777

CA

05/09/03

 

 

 

 

 

 

As always, being knowledgeable regarding the
contract rules is your best defense against bidding incorrectly.  Please
read it carefully and completely before you bid.

If
you have any further questions regarding the System Bid, please contact your
Chief Pilot�s Office.

Regards,

Captain Fred Abbott
Vice President – Flight Operations

 

 

 

 

 

 

 

 

 

 

 

 

 

 Continental
Airlines

 

 

 

 

 

 

 

 Bid
03-08

 

 

 

 

 

 

 

     
777

 

 

 

 

 

 

 

 

 

 

 

 

 

Actual # of

  Position

      
Requirement

 

Vacancies

Reductions

Net

 

bidders

 

Min

Max

 

 

 

 

 

 

 

IAH 777 CA

55

55

 

9

 

0

 

 

46

IAH 777 FO

120

120

 

18

 

0

 

 

102

 

 

 

 

 

 

 

 

 

 

NYC 777 CA

63

65

 

0

 

0

 

 

65

NYC 777 FO

127

127

 

0

 

0

 

 

127

 

 

 

 

 

 

 

 

 

 

TOTAL 777 CA

118

120

 

9

 

0

9

Vacancies

111

TOTAL 777 FO

247

247

 

18

 

0

18

Vacancies

229

 

 

 

 

 

 

 

 

 

 

 

 

 

 Continental
Airlines

 

 

 

 

 

 

 

 Bid
03-08

 

 

 

 

 

 

 

  
757/767

 

 

 

 

 

 

 

 

 

 

 

 

 

Actual # of

  Position

      
Requirement

 

Vacancies

Reductions

Net

 

bidders

 

Min

Max

 

 

 

 

 

 

 

IAH 757/767 CA

148

158

 

0

 

0

 

 

158

IAH 757/767 FO

195

200

 

0

 

25

 

 

225

 

 

 

 

 

 

 

 

 

 

NYC 757/767 CA

264

270

 

0

 

0

 

 

270

NYC 757/767 FO

346

358

 

0

 

0

 

 

358

 

 

 

 

 

 

 

 

 

 

TOTAL 757/767 CA

412

428

 

0

 

0

0

 

428

TOTAL 757/767 FO

541

558

 

0

 

25

25

Reductions

583

 

 

 

 

 

 

 

 

 

 

 

 

 

 Continental
Airlines

 

 

 

 

 

 

 

 Bid
03-08

 

 

 

 

 

 

 

    
MD80

 

 

 

 

 

 

 

 

 

 

 

 

 

Actual # of

  Position

      
Requirement

 

Vacancies

Reductions

Net

 

bidders

 

Min

Max

 

 

 

 

 

 

 

IAH M80 CA

110

113

 

0

 

19

 

 

132

IAH M80 FO

110

114

 

0

 

15

 

 

129

 

 

 

 

 

 

 

 

 

 

TOTAL M80 CA

110

113

 

0

 

19

19

Reductions

132

TOTAL M80 FO

110

114

 

0

 

15

15

Reductions

129

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Continental
Airlines

 

 

 

 

 

 

 

 Bid
03-08

 

 

 

 

 

 

 

     
737

 

 

 

 

 

 

 

 

 

 

 

 

 

Actual # of

  Position

      
Requirement

 

Vacancies

Reductions

Net

 

bidders

 

Min

Max

 

 

 

 

 

 

 

CLE 737 CA

118

121

 

0

 

0

 

 

121

CLE 737 FO

120

130

 

0

 

17

 

 

147

 

 

 

 

 

 

 

 

 

 

GUM 737 CA

60

60

 

2

 

0

 

 

58

GUM 737 FO

71

74

 

0

 

0

 

 

74

 

 

 

 

 

 

 

 

 

 

IAH 737 CA

539

552

 

0

 

0

 

 

544

IAH 737 FO

552

576

 

0

 

0

 

 

553

 

 

 

 

 

 

 

 

 

 

NYC 737 CA

383

388

 

0

 

0

 

 

388

NYC 737 FO

406

432

 

0

 

0

 

 

408

 

 

 

 

 

 

 

 

 

 

TOTAL 737 CA

1100

1121

 

2

 

0

2

Vacancies

1111

TOTAL 737 FO

1149

1212

 

0

 

17

17

Reductions

1182

 

 

 

 

 

 

 

 

 

 

 

 

 

 Continental
Airlines

 

 

 

 

 

 

 

 Bid
03-08

 

 

 

 

 

 

 

     
ALL

 

 

 

 

 

 

 

 

 

 

 

 

 

Actual # of

  Position

      
Requirement

 

Vacancies

Reductions

Net

 

bidders

 

Min

Max

 

 

 

 

 

 

 

ALL CA

1740

1782

 

11

 

19

8

Reductions

1782

ALL FO

2047

2131

 

18

 

57

39

Reductions

2123

 

 

 

 

 

 

 

 

 

 

TOTAL ALL

3787

3913

 

29

 

76

47

Reductions

3905

 

 

SUB-BASE
OPENINGS

SUB-BASE
CLOSURES